Start with the issues that matter locally: water, trees, wildlife, traffic, parking and housing. Explore the full questions page for more detail about the proposal and the planning process.
Will stormwater from new development enter Karaaf?
The proposed controls include a requirement to prevent urban stormwater entering the Karaaf Wetlands. If approved, compliance would need to be demonstrated through detailed design and subsequent approvals, including treatment, runoff reduction, harvesting and reuse. The proposed response would also need to address Deep Creek and Grasstree Park’s environmental needs.
Read more →Does protecting Karaaf transfer impacts to Deep Creek?
The proposed controls would require an Integrated Water Management Plan to demonstrate how Deep Creek’s geomorphic integrity and function could be protected. Stormwater-volume reduction, treatment, harvesting and reuse form part of the proposed response before any managed residual flows leave the development area. Compliance and receiving-waterway impacts remain subject to assessment and approval.
Read more →How would Grasstree Park’s water needs be protected?
The proposed controls would require an appropriate environmental water flow to Grasstree Park Nature Reserve. An Integrated Water Management Plan would need to demonstrate how this could be achieved alongside the proposed outcomes for Karaaf and Deep Creek. The reserve’s hydrological and ecological needs would inform detailed design, with compliance subject to assessment and approval.
Read more →Is Torquay’s protected settlement boundary changing?
No. The proposal does not move or extend Torquay's protected settlement boundary. It applies to land within the existing boundary. Specific landscape and built-form controls are proposed for the transition to the Thompson Creek Valley, including the ridgeline that forms an important visual edge to the township.
Read more →How would the ridgeline and rural landscape be protected?
The proposed landscape overlay seeks to keep high points and ridgelines vegetated, protect views to the landscape and prevent buildings and infrastructure from dominating the skyline. Setbacks, building controls and indigenous planting would support a generous urban–rural transition. Future applications would need relevant plans, sections, elevations and sightline analysis.
Read more →What would happen to existing trees and vegetation?
Some native vegetation and canopy-tree removal is proposed; not every existing tree would be retained. The biodiversity and arborist assessments identify vegetation values and trees for retention. Proposed controls and permit conditions address approved removals, tree protection during works, native vegetation offsets and new planting. Grasstree Park remains a conservation reserve.
Read more →How do green streets connect parks and habitat?
The ridgeline is proposed as a continuous ecological corridor, with green streets intended to extend those connections through the neighbourhood. Planted nature strips, groundcover and tree canopy would link the street and shared-path network with wetland landscapes and local parks, alongside proposed connections at the Grasstree Park interface and towards future precinct destinations. The aim is to strengthen habitat connections while supporting walking, cycling and local access.
Read more →How would kangaroos be managed?
Under the proposed controls, a suitably qualified ecologist would need to prepare a Kangaroo Management Plan before subdivision certification, with implementation secured through the approval requirements. It would assess kangaroo populations within the development area and at least one kilometre beyond it, movement corridors, risks of animals becoming landlocked, refuge areas, development staging, animal welfare and public safety.
Read more →Has the land been tested for contamination, including dieldrin?
Environmental assessments have been completed for all sites in Messmate North. They consider historical land uses and potential contamination, including agricultural chemicals such as dieldrin. The three completed Preliminary Risk Screen Assessments report that dieldrin was not detected above relevant human health and ecological criteria in the samples analysed. Any further site-specific assessment, audit or management measures identified through the planning process would need to be addressed before relevant development could proceed.
Read more →How many homes are proposed?
The three draft permits propose 746 lots at 50 Messmate Road, 195 at 120 Messmate Road and 248 at 1350 Surf Coast Highway and 40 Messmate Road: 1,189 lots in total. The Explanatory Report estimates approximately 1,350 homes across the completed northern precinct when medium-density sites are included. Lots and completed homes are different measures.
Read more →Would new housing create more traffic?
Yes, new housing would generate additional vehicle trips. The current Traffic Report assesses the proposed network and future traffic conditions. The proposal includes road connections, active-transport infrastructure and provision for potential future buses. Specific road works, designs, timing and traffic-management arrangements would be resolved through the relevant subdivision and engineering approvals.
Read more →How would parking be provided?
Parking forms part of the proposed street network and future housing design. The Traffic Report includes on-street parking in relevant local streets, with arrangements varying by street type. Detailed designs would need to address access, pedestrian and cycling connections, landscaping and road safety. Parking for future homes would be assessed against the applicable planning requirements.
Read more →Would affordable housing be provided?
If approved, the proposed planning framework would require an affordable-housing contribution. An Affordable Housing Delivery Strategy would set out how it is delivered, including the housing mix, location, ownership and management arrangements, affordability and timing. The proposed controls and individual draft permits set out the relevant requirements.
Read more →How would infrastructure be funded and staged?
The proposed Development Contributions Plan and North Shared Infrastructure Funding Plan operate together. Applicable permit and agreement requirements would address levies, works-in-kind, credits and reimbursement arrangements. Stage-specific infrastructure plans would identify works and land requirements. Funding differs by asset; these mechanisms do not mean all infrastructure has one funding source or that every facility opens with the first homes.
Read more →How can the community make a submission?
Read the consultation documents and make a submission through Engage Victoria by 13 November 2026. You can explain the issue that concerns you, the outcome you seek and any relevant local knowledge. The Department of Transport and Planning is consulting on behalf of the Minister for Planning before a decision is made. For amendment and consultation enquiries, contact DTP’s Planning Facilitation branch. Lodge formal submissions through Engage Victoria.