A proposed neighbourhood · Torquay

Messmate North.
Shaped by place.

Torquay’s next chapter, grounded in its landscape.
A proposed neighbourhood with homes for different lives, thoughtful water design and green connections that bring nature and neighbours closer.

Draft Amendment C153surf and three associated draft permits · Proposed, subject to approval

Explore the proposal ↓
Project landscape photography · Spiire
A shared vision for Messmate North
Anseed ↗MAKE ↗Integra ↗

01 · Place and context

Where is
Messmate North?

On Torquay’s northern edge, within its existing protected settlement boundary.

Draft Amendment C153surf proposes a planning framework across the wider Messmate Future Urban Area. Messmate North is the first proposed stage, covering 50 and 120 Messmate Road, 1350 Surf Coast Highway and 40 Messmate Road. Southern and later stages would be progressed separately by other parties and would need their own approvals.

The protected settlement boundary is not proposed to move. The ridgeline and the transition towards the Thompson Creek Valley are material design considerations.

Explore the wider setting ↗
The wider setting

Within Torquay.
Connected to its landscape.

Messmate North forms the northern part of the wider Future Urban Area. Its setting brings together the ridgeline, Grasstree Park and the surrounding township. The proposal’s landscape and movement networks respond to these connections.

Explore the landscape response →
01 · A contained townshipThe ridgeline edge

The protected settlement boundary defines the edge of the future urban area.

02 · A landscape neighbourGrasstree Park

The nature reserve sits beside Messmate Road and remains a conservation reserve.

03 · Part of TorquayExisting connections

Messmate Road, Coombes Road and Surf Coast Highway place the precinct within the wider township.

Why Messmate? · Why now?

Planned for growth.
The detail is now
on exhibition.

Messmate Road has been identified for Torquay’s future urban growth for many years.

The current amendment seeks to establish how that planned growth should occur: the housing, infrastructure, landscape and environmental requirements for land within the existing protected settlement boundary.

The planning history provides context. It does not determine the outcome of C153surf or replace the community’s opportunity to have a say.

  1. 2007

    A structure-plan foundation

    Messmate Road features in the Torquay–Jan Juc Structure Plan.

    Council planning library ↗
  2. 2014

    Planning for 2040

    Council’s adopted Sustainable Futures Plan continues the strategic direction for growth at Messmate Road.

    Sustainable Futures Plan ↗
  3. 2022

    A protected township edge

    The Surf Coast Statement of Planning Policy identifies the future urban area and sets the protected settlement boundary and landscape expectations.

    Statement of Planning Policy ↗
  4. 2025–2026

    From strategy to detail

    Council’s Urban Futures Strategy and Messmate Road concept planning continue that direction. C153surf and three draft permits are now on exhibition.

    Council’s Messmate Road information ↗
Why is residential development proposed at Messmate Road?

Messmate Road has been identified for Torquay’s future urban growth through successive strategic-planning processes for many years. Draft Amendment C153surf seeks to establish the detailed planning, infrastructure, environmental and landscape framework for that planned growth within the existing protected settlement boundary. The current proposal remains subject to consultation and a decision.

Read more →
Is Messmate Road a newly identified growth area?

No. Messmate Road is not a newly identified growth area arising from the current landowner proposal. It featured in the Torquay–Jan Juc Structure Plan in 2007 and Council’s Sustainable Futures Plan Torquay–Jan Juc 2040, adopted in 2014. The Surf Coast Statement of Planning Policy (2022) identifies the Messmate Road future urban area, and more recent Council planning has continued to plan for future residential development here.

Read more →
Is the protected settlement boundary changing?

No. The boundary stays.

Messmate North is already within Torquay–Jan Juc’s existing protected settlement boundary. C153surf does not move or extend it. The proposal must address the sensitive ridgeline and rural interface within that boundary.

Read about the boundary →

02 · Proposal at a glance

Four themes.
One coordinated proposal.

03 · Landscape responsive

A defined edge.
A landscape response.

The protected settlement boundary is not moving. Proposed landscape and built-form controls address the ridgeline, views from the Thompson Creek Valley and the transition to rural land.

Setbacks, height, materials, subdued colours and indigenous planting would be considered through the relevant controls and detailed designs.

Indicative ridgeline landscape with a planted trail, trees, local street and residential edge
A planted transition between the future neighbourhood and the surrounding landscape.Ratio, October 2026. Indicative design intent.
A contained township

A boundary that stays.

The protected settlement boundary remains in place.

A considered skyline

Buildings within a landscape.

Height, siting, materials and planting are addressed through the proposed controls.

An everyday connection

A landscape to move through.

The concept includes a planted trail along the neighbourhood’s edge.

Read the landscape controls and full answer →
Existing grass trees and eucalypts in Grasstree Park Nature Reserve
Existing Grasstree Park Nature Reserve.
Existing vegetation and future canopy

Retain what is special.
Plan for new canopy.

Existing trees are assessed through the biodiversity and arborist work. Some vegetation removal is proposed, alongside retention, construction protection, offsets and new planting.

The proposed DPO15 would require the Development Plan to demonstrate how a minimum 30% tree canopy cover within streetscapes and public open space, excluding wetlands and active recreation reserves, could be achieved. New canopy planting is separate from retaining existing trees. Grasstree Park remains a conservation reserve.

Read about trees, habitat and vegetation →
Explore the vegetation and canopy plans

The first drawing identifies proposed retention and removal of existing vegetation. The second shows the proposed canopy-tree approach.

Development Plan drawing showing existing vegetation proposed for retention and removal, with its legendEnlarge ↗
Vegetation retention and removal · Spiire Development Plan, revision 36.
Development Plan drawing showing the proposed canopy-tree planting approachEnlarge ↗
Proposed canopy-tree plan · Spiire Development Plan, revision 36.

04 · Water sensitive

Karaaf, Deep Creek
and Grasstree Park.

Keeping urban stormwater out of the Karaaf Wetlands is a proposed requirement. Detailed design and subsequent approvals would need to demonstrate compliance.

The proposed controls would also require protection of Deep Creek’s geomorphic integrity and function — the waterway’s physical form and how it works — and an appropriate environmental water flow to Grasstree Park Nature Reserve. An Integrated Water Management Plan would need to demonstrate how these outcomes could be achieved through detailed design, harvesting, reuse and delivery arrangements, subject to assessment and approval.

Illustrative drainage landscape showing basins, planting, a local park and the Messmate Road interface
Making space for drainage within the neighbourhood layout.Spiire · Development Plan, illustrative drainage detail. Subject to detailed design.
From precinct planning to landscape character

Water has a place
in the neighbourhood.

The planning drawings make room for drainage infrastructure, planting and local open space. The landscape concepts explore how water-management areas could also contribute to the character of the neighbourhood.

Indicative landscape character of the proposed Messmate Park wetland and walking platform
The proposed Messmate Park wetland landscape.Ratio · October 2026. Indicative design intent.

These illustrations show different landscape areas within the precinct. They do not depict Karaaf Wetlands.

Read the full water-management answers →

05 · Housing choice and connected infrastructure

Housing choice.
Green streets. Shared spaces.

The proposal combines different lot sizes and dwelling types with an affordable-housing contribution that would be required if the proposed planning framework is approved. An Affordable Housing Delivery Strategy would guide how that contribution is delivered.

The neighbourhood would have its own parks, paths and recreation network. Grasstree Park remains a conservation reserve.

Indicative green street showing people walking beside trees, planting and a raingarden
Street trees, walking connections and raingardens form part of the proposed green-street approach.Ratio, October 2026. Indicative design intent.
The everyday journey

Green streets.
Connected landscapes.

Green streets are part of the proposed ecological network. Generous planted nature strips, groundcover, tree canopy and shared paths are intended to connect the ridgeline with wetland and local park areas, while making walking and cycling part of everyday life.

Green streets · ecological links

From the ridgeline
to parks and wetlands.

The ridgeline is proposed as the neighbourhood’s landscape spine: a continuous ecological corridor with integrated paths. Green streets are intended to extend those connections into the neighbourhood, linking the ridgeline with wetland landscapes and local parks.

Generous planted nature strips and a connected tree canopy are intended to strengthen habitat connections through the street and shared-path network. The proposed network is also intended to support everyday journeys between homes, green spaces and the wider precinct.

Explore the full plan ↗
One connected landscape network.Ecological Links Plan · Spiire North Development Plan. Proposed, subject to approval.
01 · The landscape spine

Ridgeline corridor

The proposed ridgeline corridor is intended to form a continuous landscape spine, with integrated paths providing connections through this planted edge.

02 · Links through the neighbourhood

Green streets

Within selected streets, generous nature-strip planting, groundcover and tree canopy are proposed to extend the landscape network alongside shared walking and cycling paths.

03 · Places brought together

Parks and wetland areas

Ecological links are intended to bring the ridgeline, wetlands and local parks into one network, with proposed connections along the Grasstree Park interface and towards the future employment area and local centre.

Green streets remain streets, with an ecological and landscape role; they are distinct from dedicated conservation reserves. Detailed planting, crossings and habitat outcomes remain part of the design and approval process. Grasstree Park remains a conservation reserve.

Read how green streets connect parks and habitat →
Space for everyday discovery

A park woven
into the neighbourhood.

The Messmate Park concept combines nature play, trails and planting with the proposed wetland landscape. Neighbourhood recreation would have its own spaces; Grasstree Park remains a conservation reserve.

Indicative nature play area and walking trail within the proposed Messmate Park landscape
Nature play and landscape connections in the proposed Messmate Park.Ratio, October 2026. Indicative design intent.
Existing road and mature trees pictured in the 120 Messmate Road urban design report
The existing road setting.Photography · Spiire, 120 Messmate Road urban design report.
Connected streets · shared journeys

Beyond the
front door.

New homes would bring more traffic. The proposed network also makes provision for walking, cycling, local access and on-street parking in relevant streets.

Detailed layouts and delivery requirements would be resolved through the relevant approvals.

An illustrative trail and local-street interface.Spiire · Development Plan, revision 36. Design intent.
Explore traffic, streets and parking →

Images explain design intent.

06 · Understand the plans

The wider framework.
The northern proposal.

What the amendment seeks to do. Draft Amendment C153surf proposes changes to the Surf Coast Planning Scheme to establish a framework across the wider Messmate Future Urban Area. It includes proposed residential rezoning for northern Stage 1, development and landscape controls, and funding mechanisms for shared infrastructure. The North Development Plan and three draft permit applications address subdivision and associated works in the north; later stages would be progressed separately.

What remains to be decided. The Minister for Planning has not yet made a decision. The amendment, proposed controls, Development Plan and draft permits remain under consideration. Water-management compliance, road connections, park layouts, vegetation and wildlife management, infrastructure staging and affordable-housing delivery remain subject to further assessment, detailed design and approvals as applicable. Consultation may lead to changes.

This page explains the landowner group’s proposal. Its publication does not indicate endorsement or approval by the Minister or Council. The plans below illustrate the proposal under consideration.

Indicative northern precinct landscape masterplan showing the ridgeline, connected streets and parks
A coordinated landscape: a defined edge, connected streets and a network of parks.Ratio, October 2026. Indicative design intent.
01A landscape edge

Planting and built-form controls respond to the ridgeline.

02Everyday connections

Streets and paths link homes with open space.

03Parks and water

Landscape and water management are considered together.

Explore the wider precinct and proposed Development Plan
Wider Messmate Future Urban Area concept plan showing residential, employment, open-space and drainage areasEnlarge ↗
Wider precinct — Precinct Concept PlanSpiire, revision 36, 23 September 2026, page 9. Proposed concept, subject to approval.
Urban Structure Plan extracted from the supplied North Development PlanEnlarge ↗
Messmate North — proposed Development PlanProposed North Development Plan · Spiire, revision 36.
Three associated draft planning permit applications
Draft permitLandProposed lots
PA 260464250 Messmate Road746
PA 2604639120 Messmate Road195
PA 26046431350 Surf Coast Highway and 40 Messmate Road248

1,189 lots across the three draft permits. The Explanatory Report estimates approximately 1,350 homes across the completed northern precinct when medium-density sites are included. These are different measures.

07 · The studies behind the plan

The studies
behind the proposal.

Understand how landscape, water, ecology, traffic and other technical studies have informed the proposal. Each topic explains what was assessed, the proposed response and the next steps.

01

Landscape and views

How would the precinct fit its setting?

Views, ridgeline visibility, landscape character and the updated landscape response.

Explore the assessment and next steps
Proposed response
A landscaped ridgeline and controls on height, setbacks, materials and planting are proposed to keep development subordinate to the landscape.
Control or approval pathway
Proposed SLO12 and DPO15; permit-level sightline and landscape assessment.
Next steps
Detailed views, elevations and landscape designs remain subject to assessment.
02

Traffic and movement

How would people move around?

Development traffic, roads, intersections, access, walking, cycling and future bus provision.

Explore the assessment and next steps
Proposed response
An interconnected street system, shared paths, crossings and road upgrades are proposed. New homes would generate additional traffic.
Control or approval pathway
Development Plan and permit-specific road and engineering requirements.
Next steps
Road designs, works and timing would vary by permit area and remain subject to detailed approvals.
03

Environment and ecology

What would protect waterways, trees and wildlife?

Catchments, receiving waterways, vegetation, habitat and arboricultural values.

Explore the assessment and next steps
Proposed response
The proposed controls seek to prevent urban stormwater entering Karaaf and protect Deep Creek and Grasstree Park. Compliance would need to be demonstrated through detailed design and subsequent approvals. Assessments and proposed conditions address vegetation retention, removals and wildlife management.
Control or approval pathway
Proposed DPO15; endorsed IWMP, Kangaroo Management Plan and relevant vegetation permit conditions.
Next steps
Detailed water-management designs, vegetation offsets and construction protections would be approved and implemented through the relevant requirements.
04

Bushfire

How would bushfire risk shape development?

Vegetation, topography, surrounding hazards, access, water supply and construction response.

Explore the assessment and next steps
Proposed response
The current assessment identifies mitigation through separation, low-threat areas, perimeter roads, suitable access and building controls.
Control or approval pathway
Bushfire assessment and relevant permit/subdivision restrictions.
Next steps
Setbacks vary by vegetation, slope and location. There is no single precinct-wide setback.
05

Land conditions

What checks are required for residential use?

Historic land use, potential contamination sources and property-specific assessment requirements.

Explore the assessment and next steps
Proposed response
The Explanatory Report describes a PRSA pathway for all land and an Environmental Audit Overlay over part of 1350 Surf Coast Highway. Outcomes vary by property.
Control or approval pathway
Proposed DPO15, Environmental Audit Overlay and applicable permit requirements.
Next steps
The proposed approval framework would require investigations, any necessary audit and implementation of findings before relevant sensitive development. This does not mean all land is contaminated.
06

Services and infrastructure

How would works be funded and staged?

Utility connections, drainage, roads, shared infrastructure, community needs and contribution arrangements.

Explore the assessment and next steps
Proposed response
The proposed DCP and SIFP include complementary funding mechanisms, with staged and permit-level implementation if approved.
Control or approval pathway
Proposed DPO15, incorporated DCP/SIFP and relevant section 173 arrangements.
Next steps
Authority capacity checks, detailed designs, contributions and delivery triggers remain asset- and permit-specific.
07

Housing and affordability

What housing choices are proposed?

Housing demand, land supply, household needs and affordable-housing provision.

Explore the assessment and next steps
Proposed response
A mix of homes and an affordable-housing contribution is proposed, with delivery arrangements to be set out in an Affordable Housing Delivery Strategy.
Control or approval pathway
Proposed DPO15, draft permit framework and Housing Design Guidelines.
Next steps
The delivery strategy and legal agreements would establish the contribution, delivery model and timing under the relevant controls and permits.

08 · Priority community questions

Your questions.
Clear answers.

Start with the issues that matter locally: water, trees, wildlife, traffic, parking and housing. Explore the full questions page for more detail about the proposal and the planning process.

Will stormwater from new development enter Karaaf?

The proposed controls include a requirement to prevent urban stormwater entering the Karaaf Wetlands. If approved, compliance would need to be demonstrated through detailed design and subsequent approvals, including treatment, runoff reduction, harvesting and reuse. The proposed response would also need to address Deep Creek and Grasstree Park’s environmental needs.

Read more →
Does protecting Karaaf transfer impacts to Deep Creek?

The proposed controls would require an Integrated Water Management Plan to demonstrate how Deep Creek’s geomorphic integrity and function could be protected. Stormwater-volume reduction, treatment, harvesting and reuse form part of the proposed response before any managed residual flows leave the development area. Compliance and receiving-waterway impacts remain subject to assessment and approval.

Read more →
How would Grasstree Park’s water needs be protected?

The proposed controls would require an appropriate environmental water flow to Grasstree Park Nature Reserve. An Integrated Water Management Plan would need to demonstrate how this could be achieved alongside the proposed outcomes for Karaaf and Deep Creek. The reserve’s hydrological and ecological needs would inform detailed design, with compliance subject to assessment and approval.

Read more →
Is Torquay’s protected settlement boundary changing?

No. The proposal does not move or extend Torquay's protected settlement boundary. It applies to land within the existing boundary. Specific landscape and built-form controls are proposed for the transition to the Thompson Creek Valley, including the ridgeline that forms an important visual edge to the township.

Read more →
How would the ridgeline and rural landscape be protected?

The proposed landscape overlay seeks to keep high points and ridgelines vegetated, protect views to the landscape and prevent buildings and infrastructure from dominating the skyline. Setbacks, building controls and indigenous planting would support a generous urban–rural transition. Future applications would need relevant plans, sections, elevations and sightline analysis.

Read more →
What would happen to existing trees and vegetation?

Some native vegetation and canopy-tree removal is proposed; not every existing tree would be retained. The biodiversity and arborist assessments identify vegetation values and trees for retention. Proposed controls and permit conditions address approved removals, tree protection during works, native vegetation offsets and new planting. Grasstree Park remains a conservation reserve.

Read more →
How do green streets connect parks and habitat?

The ridgeline is proposed as a continuous ecological corridor, with green streets intended to extend those connections through the neighbourhood. Planted nature strips, groundcover and tree canopy would link the street and shared-path network with wetland landscapes and local parks, alongside proposed connections at the Grasstree Park interface and towards future precinct destinations. The aim is to strengthen habitat connections while supporting walking, cycling and local access.

Read more →
How would kangaroos be managed?

Under the proposed controls, a suitably qualified ecologist would need to prepare a Kangaroo Management Plan before subdivision certification, with implementation secured through the approval requirements. It would assess kangaroo populations within the development area and at least one kilometre beyond it, movement corridors, risks of animals becoming landlocked, refuge areas, development staging, animal welfare and public safety.

Read more →
Has the land been tested for contamination, including dieldrin?

Environmental assessments have been completed for all sites in Messmate North. They consider historical land uses and potential contamination, including agricultural chemicals such as dieldrin. The three completed Preliminary Risk Screen Assessments report that dieldrin was not detected above relevant human health and ecological criteria in the samples analysed. Any further site-specific assessment, audit or management measures identified through the planning process would need to be addressed before relevant development could proceed.

Read more →
How many homes are proposed?

The three draft permits propose 746 lots at 50 Messmate Road, 195 at 120 Messmate Road and 248 at 1350 Surf Coast Highway and 40 Messmate Road: 1,189 lots in total. The Explanatory Report estimates approximately 1,350 homes across the completed northern precinct when medium-density sites are included. Lots and completed homes are different measures.

Read more →
Would new housing create more traffic?

Yes, new housing would generate additional vehicle trips. The current Traffic Report assesses the proposed network and future traffic conditions. The proposal includes road connections, active-transport infrastructure and provision for potential future buses. Specific road works, designs, timing and traffic-management arrangements would be resolved through the relevant subdivision and engineering approvals.

Read more →
How would parking be provided?

Parking forms part of the proposed street network and future housing design. The Traffic Report includes on-street parking in relevant local streets, with arrangements varying by street type. Detailed designs would need to address access, pedestrian and cycling connections, landscaping and road safety. Parking for future homes would be assessed against the applicable planning requirements.

Read more →
Would affordable housing be provided?

If approved, the proposed planning framework would require an affordable-housing contribution. An Affordable Housing Delivery Strategy would set out how it is delivered, including the housing mix, location, ownership and management arrangements, affordability and timing. The proposed controls and individual draft permits set out the relevant requirements.

Read more →
Will the development contribute to new community facilities?

Yes. Development in the Northern Precinct would help fund new sports and community facilities planned for the Southern Precinct, serving the wider Messmate growth area. These include an approximately 5.3-hectare active open space reserve with sports fields and a pavilion, and a multipurpose community centre of around 850m² for services such as kindergarten, maternal and child health, and community meeting spaces. Delivery would be staged in response to growth and demand.

Read more →
How would infrastructure be funded and staged?

The proposed Development Contributions Plan and North Shared Infrastructure Funding Plan operate together. Applicable permit and agreement requirements would address levies, works-in-kind, credits and reimbursement arrangements. Stage-specific infrastructure plans would identify works and land requirements. Funding differs by asset; these mechanisms do not mean all infrastructure has one funding source or that every facility opens with the first homes.

Read more →
How can the community make a submission?

Read the consultation documents and make a submission through Engage Victoria by 13 November 2026. You can explain the issue that concerns you, the outcome you seek and any relevant local knowledge. The Department of Transport and Planning is consulting on behalf of the Minister for Planning before a decision is made. For amendment and consultation enquiries, contact DTP’s Planning Facilitation branch. Lodge formal submissions through Engage Victoria.

Read more →
Explore all 45 community questions →

09 · Enquiries and submissions

Keep the
conversation open.

For questions about the amendment and consultation process:

Department of Transport and Planning

Planning Facilitation branch

planning.facilitation@transport.vic.gov.au ↗

Official consultation and submission form ↗

Lodge formal submissions through Engage Victoria by 13 November 2026. Emailing DTP does not lodge a submission.

Images explain design intent.